Portable shower-restroom trailer combination rentals in Avon Park, Florida.
WoodRentals offers portable shower-restroom trailers combination for rent in Avon Park, Florida, for a community gathering, contractor staging area, or renovation that temporarily closes building bathrooms. Portable shower-restroom trailers combination let you plan around the people using the site, while standalone shower, laundry, and sleeper facilities support extended assignments. Call our team 24/7 for support and emergency deployment coordination if repairs require emergency mobile shower-restroom trailer combination rentals. We confirm the equipment and dispatch plan against your dates, site details, and unit availability.
Explore Avon Park infrastructure projects ↓
- Portable restroom trailer starting price
- Starting at $7,000
- Delivery planning
- Delivery schedule confirmed in your quote
Explore restroom and related facility options for Avon Park.
Portable restroom trailers and shower/restroom combination trailers are the main products. Separate shower, laundry, and sleeper facilities can support other site needs in Highlands County.

Restroom Trailer
A portable restroom trailer rental can maintain bathroom access during restroom renovations, at active worksites, or at events with added demand. Review the restroom-only configuration around expected users, site access, and servicing needs.
View model details ↗
13ft Luxury Shower-Restroom Combination Trailer, 3 Stalls
Choose a portable shower/restroom combination trailer rental in a nominal 13ft layout with three individual stalls. This configuration gives a smaller temporary site one facility to consider for both daily washing and bathroom access.
View model details ↗
22ft Luxury Shower-Restroom Combination Trailer, 6 Stalls
A portable shower/restroom combination trailer rental in a nominal 22ft layout provides six individual stalls. Compare this model when a temporary accommodation area, worksite, or facility renovation needs more simultaneous access than a three-stall configuration.
View model details ↗
20ft Shower Trailer, 5 Stalls with Handwashing Sink
A portable shower trailer rental with five stalls and a handwashing sink can support workforce accommodation, building repairs, or extended field operations. Plan shower schedules, water supply, and wastewater service for the nominal 20ft unit.
View model details ↗
26–27ft Laundry Trailer
A mobile laundry trailer rental in the nominal 26–27ft range can support washing and drying during workforce accommodation or extended site projects. Compare the assigned machine schedule with expected loads, operating hours, and shared-use routines.
View model details ↗
2-Stall Sleeper Trailer
Plan separate sleeping areas for a small crew or assigned staff. The 2-stall sleeper option can form part of a temporary camp without committing to a large shared sleeping hall.
View model details ↗
Set up crew restroom access for work in Wauchula
For construction, utility, or maintenance work in Wauchula, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Plan restroom capacity for events in Highland Park
For an event in Highland Park, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.
Main restroom products and supporting facilities.
Portable restroom trailers and shower/restroom combination trailers are the main products. Shower, laundry, and sleeper facilities support related site needs in Avon Park.
Scroll across the table to compare configurations.
| Product or facility | Size / configuration | Role | Facility type |
|---|---|---|---|
| Portable restroom trailer | Unit-specific configuration | Main product | Portable restroom |
| Shower/restroom combination trailer | 13 ft · 3 combination stalls | Main product | Shower + restroom |
| Shower/restroom combination trailer | 22 ft · 6 combination stalls | Main product | Shower + restroom |
| Shower/restroom combination trailer | 30 ft · 8 stalls | Main product | Shower + restroom |
| Shower container | 20 ft · 5 stalls | Supporting facility | Shower |
| Laundry container | 20 ft | Supporting facility | Laundry |
| Laundry trailer | 26–27 ft · 8 washer/dryer units | Supporting facility | Laundry |
| Sleeper trailer | Configuration confirmed in quote | Supporting facility | Sleeper accommodation |
Confirm the assigned unit’s layout, delivery requirements, rental term, and availability in your quote.
Fire destroyed the former Beachfront Night Club building on West Garrett Road
Around 8 p.m. on June 10, 2026, Highlands County Fire Rescue was sent to the former Beachfront Night Club on West Garrett Road. Responders found heavy fire in the roughly 10,000-square-foot building. About 15 apparatus and 40 to 50 emergency personnel worked through the night and into Wednesday morning. Officials reported no injuries, and the structure was declared a total loss.
One person was living in the building while the owner worked on its restoration. The fire chief described the loss as a blow to residents who remembered the club; investigators asked the State Fire Marshal’s Office to determine the fire’s origin and cause. ABC 7 did not report a cleanup timeline or decision about the property’s future.
Supporting sources
Avon Park removed the Memorial Drive path from its 2025–26 budget
Avon Park’s 2025–30 capital plan proposed replacing the Memorial Drive sidewalk with a 2,275-foot, eight-foot asphalt path from Southside County Road 14 to Northside Ben Hicks Street. The plan put $157,070 toward the path and listed streetlights separately. It priced the lights at $180,000 and showed concrete as an alternative for $37,020 more.
A later budget revision removed the path’s $157,070 from the infrastructure fund. The record does not say the idea was abandoned permanently, but the city had taken it out of the 2025–26 budget, so no contractor or construction schedule followed in that plan.
Portable restroom and shower/restroom trailer starting prices.
Compare starting prices for portable restroom and shower/restroom combination trailers in Avon Park. Confirm configuration, rental term, delivery, and availability with our team.
| Main restroom product | Size / configuration | Starting price |
|---|---|---|
| Portable restroom trailer | Unit-specific configuration | $7,000 |
| Shower/restroom combination trailer | 13 ft · 3 combination stalls | $2,495 |
| Shower/restroom combination trailer | 22 ft · 6 combination stalls | $4,995 |
| Shower/restroom combination trailer | 30 ft · 8 stalls | $3,995 |
Supporting facility starting prices
| Supporting facility | Size / configuration | Starting price |
|---|---|---|
| Shower container | 20 ft · 5 stalls | $3,995 |
| Laundry container | 20 ft | $3,995 |
| Laundry trailer | 26–27 ft · 8 washer/dryer units | $3,995 |
| Sleeper trailer | Configuration confirmed in quote | Request quote |
Prices shown are starting prices from the pricing sheet. It does not state a billing period for every item; confirm rental term, availability, delivery, setup, and equipment details in your quote.
Need help now? Call 888 385 6418 for 24/7 support and current availability.

Set up crew restroom access for work in Bowling Green
For construction, utility, or maintenance work in Bowling Green, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Maintain restroom access during facility work in Lake Placid
A renovation, repair, or temporary washroom closure in Lake Placid can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.
Avon Park’s fire-station hardening work reached closeout
Avon Park’s March 2026 grant matrix marked the Fire Station Hardening project complete and preparing closeout documents. Of the $894,087 award, the city listed $835,353.29 spent and $58,733.71 remaining at that point.
The work included roof removal and replacement, new doors and window shutters, wall and ceiling repairs, electrical upgrades, a new main panel and paging system, plus kitchen and bunk-room improvements.
Those changes reached from the station’s weather protection into the spaces firefighters use between calls. The city had moved the project into closeout; the update does not describe more construction still underway.
Supporting sources
Avon Park’s Main Street concepts still depend on FDOT coordination
Avon Park’s Main Street ideas are still at the coordination stage because FDOT owns the road. The city’s project page describes a possible Eastern Loop, sidewalk and crossing improvements, and median work near Main Street and U.S. 27. Those pieces affect one of the city’s key through-routes, so the city cannot set a construction schedule on its own.
The city’s status table shows why the corridor has not moved into construction: FDOT coordination and an April site walk are complete, but the eastern-loop request remains in progress, with western crossings planned for a later phase. Permitting and construction are still pending. The city lists separate median landscaping work at Main Street and U.S. 27 as active.
Supporting sources

Plan restroom capacity for events in Fort Meade
For an event in Fort Meade, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Plan restroom capacity for events in Lake Wales
For an event in Lake Wales, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.
Avon Park’s sewer-hardening work has a $22.25 million state award
Avon Park had already received a $22,248,529 state award for sewer hardening when the project came before council on March 9, 2026. The city was being asked to execute the subrecipient agreement; work was not yet reported as underway.
The scope starts with televised inspection of about 214,500 feet of sewer line and assessment of 845 manholes. It then calls for rehabilitation of roughly 161,500 feet of mains and laterals, plus replacement of about 8,000 feet of severely deteriorated pipe that cannot be lined.
The city says the work is meant to address storm-related damage, limit inflow and infiltration, and extend the collection system’s useful life. As inspection and lining crews move between sewer segments, an emergency remote restroom trailer can stay with the field operation instead of sending workers back to the plant.
Two people died in an early-morning Econo Lodge room fire
At 1:59 a.m. on April 3, 2026, the Highlands County Sheriff’s Office received a call about a fire in a second-floor room at the Econo Lodge, 2511 U.S. 27 South. A deputy reached the hotel first, followed by county fire-rescue and Avon Park firefighters. Once they could enter the smoke-filled room, responders found an adult man and woman dead inside. No other hotel guests or first responders were reported injured.
Investigators from the Florida Bureau of Fire, Arson and Explosives joined the sheriff’s office, which opened a parallel death investigation. The cause remained open, and officials said the fire did not appear suspicious or affect other rooms.
Supporting sources
Plan around the Avon Park address.
A project in Avon Park starts with the same practical questions: which functions need to remain available, how the trailer can reach its placement, and how utilities will connect.
- Describe the site and its users
Share the location, expected occupancy, peak-use periods, and project dates.
- Review the restroom configuration
Discuss portable restroom trailers or shower/restroom combination trailers as the main product, plus separate shower, laundry, or sleeper facilities if needed.
- Check site access and connections
Confirm the delivery route, placement, accessible approach, water, wastewater, and service access.
- Confirm the rental plan
Review equipment availability, rental terms, delivery, setup, and servicing arrangements.
- Coordinate use and return
Agree on cleaning, restocking, service visits, and the return schedule before delivery.
Avon Park’s drinking-water upgrade was 90–95 percent complete in March 2026
Avon Park’s March 16, 2026 grant matrix put its MT039 drinking-water project at 90 to 95 percent complete. The city had spent $554,515.13 of a $670,023 award and listed $115,507.87 remaining.
The work replaces asbestos-cement water lines with PVC, adds a bore to improve pressure, and upgrades chlorine systems at the Glenwood and Crystal Lake treatment facilities. Crews were working across both the distribution system and the city’s treatment controls. At 90 to 95 percent, the March matrix showed a project nearing completion, but it did not confirm that the remaining repairs were finished.
Supporting sources
Donaldson Park’s pickleball courts moved from a combined bid to their own contract
Donaldson Park’s splash pad and pickleball courts first went out together as a $750,000 design-build job. The two July 2025 bids—$1,388,426.94 and $702,249.09—were both over budget, and a protest followed. The city then split the work into separate solicitations.
The CRA board approved Nidy Sports Construction’s $392,100 design-build proposal for eight courts, including shade structures, fencing, and windscreens. By the city’s April 2026 update, the agreement was still being drafted and the pickleball work was awaiting State Historic Preservation Office review. The splash pad had its own procurement, after the only initial bid exceeded its budget.

Plan restroom capacity for events in Sebring
For an event in Sebring, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Set up crew restroom access for work in Frostproof
For construction, utility, or maintenance work in Frostproof, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Maintain restroom access during facility work in Bartow
A renovation, repair, or temporary washroom closure in Bartow can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Prepare a temporary restroom plan for a Dundee site
If a site in Dundee loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Set up crew restroom access for work in Eagle Lake
For construction, utility, or maintenance work in Eagle Lake, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.
MLK Sports Complex scheduled a three-week football-field rehabilitation
Avon Park set a three-week rehabilitation window for the football field at MLK Jr. Sports Complex on South Delany Avenue: February 23 through March 13, 2026, weather permitting. A Florida Recreation Development Assistance Program grant funded the work.
The plan called for regrading to improve drainage and field performance, repairing the existing irrigation system, and removing worn turf for new sod. The city closed the field area so crews could work safely and the grass could take root. The public notice gave an expected schedule but no later inspection result or confirmed return-to-play date.
Fiber installation reached Avon Park’s Sector 3 in April 2026
An April 30, 2026 notice put fiber-optic installation in Avon Park’s Sector 3, bounded by Main Street, South Cole Road, U.S. 27 and Granite Avenue. The work could use underground or aerial installation along designated streets and public rights-of-way.
Contractors expected to finish the sector toward the end of the following week and planned to leave door hangers for nearby homes and businesses. Public Works had issued a right-of-way permit. The city warned about lane closures, sidewalk restrictions, construction noise, and equipment, and said disturbed grass would be restored close to its original condition.

Maintain restroom access during facility work in Hillcrest Heights
A renovation, repair, or temporary washroom closure in Hillcrest Heights can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Prepare a temporary restroom plan for a Zolfo Springs site
If a site in Zolfo Springs loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Set up crew restroom access for work in Lake Hamilton
For construction, utility, or maintenance work in Lake Hamilton, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Pavement restoration closed lanes at US 17 and Hickory Street
Arcadia announced lane closures for September 18–21, 2026, while crews restored pavement and new road corners at US 17 and Hickory Street.
Avon Park portable restroom rental FAQs.
What is the starting price for a portable restroom trailer in Avon Park?
The starting price shown is $7,000. The pricing sheet does not state a billing period; confirm rental term, delivery, setup, and availability in your quote.
When can a portable restroom trailer be delivered to Avon Park?
Share your Avon Park address, desired start date, equipment size, and access conditions. The team confirms availability and a workable delivery schedule in the quote; this page does not publish a fixed arrival time.
What restroom configuration is available?
Portable restroom trailers and shower/restroom combination trailers are the main products. Separate shower trailers, laundry facilities, and sleeper units support related site needs.
What supporting facilities are available?
Standalone shower trailers, laundry facilities, and sleeper units can support the site. Portable restroom trailers and shower/restroom combination trailers are the primary bathroom products; configuration and availability are confirmed for the project.
What should I prepare for my Highlands County site?
Bring the address, placement plan, delivery access details, expected users, accessible route needs, water and wastewater arrangements, servicing plan, dates, and site contact. Confirm applicable permits and inspections before dispatch.
Plan restroom access in Avon Park.
Share your site, dates, and expected users. We’ll review portable restroom and shower/restroom combination trailer options, plus any shower, laundry, or sleeper facilities needed for your Florida project.