Miami-Dade County · Florida

Portable shower-restroom trailer combination rentals in Bal Harbour, Florida.

A hospitality-property improvement or residential-building repair in Bal Harbour can leave guests and crews needing separate bathroom arrangements. WoodRentals offers portable shower-restroom trailer combination rentals in Bal Harbour, Florida, including portable shower-restroom trailers combination. Review standalone shower, laundry, and sleeper supporting facilities when work requires a longer stay. We are available 24/7 for support and emergency deployment coordination, including emergency portable shower-restroom trailer combination rentals for sudden plumbing failures. Dates, approved placement, site requirements, and equipment availability determine dispatch.

Explore Bal Harbour projects and incidents ↓
Portable restroom trailer interior with a vanity and toilet
Portable restroom trailer starting price
Starting at $7,000
Delivery planning
Delivery schedule confirmed in your quote
Main products and supporting facilities

Explore restroom and related facility options for Bal Harbour.

Portable restroom trailers and shower/restroom combination trailers are the main products. Separate shower, laundry, and sleeper facilities can support other site needs in Miami-Dade County.

Restroom interior with vanity and toilet

Restroom Trailer

A portable restroom trailer rental can maintain bathroom access during restroom renovations, at active worksites, or at events with added demand. Review the restroom-only configuration around expected users, site access, and servicing needs.

View model details ↗
Laundry trailer interior with washers and dryers

26–27ft Laundry Trailer

A mobile laundry trailer rental in the nominal 26–27ft range can support washing and drying during workforce accommodation or extended site projects. Compare the assigned machine schedule with expected loads, operating hours, and shared-use routines.

View model details ↗
Portable shower-restroom combination trailer exterior

Plan restroom capacity for events in Indian Creek

For an event in Indian Creek, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Sleeper trailer exterior with a bunk-room inset

Prepare a temporary restroom plan for a North Miami site

If a site in North Miami loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Separate shower trailer with an exterior handwashing area

Prepare a temporary restroom plan for a Golden Beach site

If a site in Golden Beach loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Sleeper trailer exterior with a bunk-room inset

Set up crew restroom access for work in El Portal

For construction, utility, or maintenance work in El Portal, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Sleeper trailer exterior with a bunk-room inset

Prepare a temporary restroom plan for a Miami Beach site

If a site in Miami Beach loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Main restroom products and supporting facilities.

Portable restroom trailers and shower/restroom combination trailers are the main products. Shower, laundry, and sleeper facilities support related site needs in Bal Harbour.

Scroll across the table to compare configurations.

Main restroom products and supporting facility configurations for Bal Harbour, Florida
Product or facilitySize / configurationRoleFacility type
Portable restroom trailerUnit-specific configurationMain productPortable restroom
Shower/restroom combination trailer13 ft · 3 combination stallsMain productShower + restroom
Shower/restroom combination trailer22 ft · 6 combination stallsMain productShower + restroom
Shower/restroom combination trailer30 ft · 8 stallsMain productShower + restroom
Shower container20 ft · 5 stallsSupporting facilityShower
Laundry container20 ftSupporting facilityLaundry
Laundry trailer26–27 ft · 8 washer/dryer unitsSupporting facilityLaundry
Sleeper trailerConfiguration confirmed in quoteSupporting facilitySleeper accommodation

Confirm the assigned unit’s layout, delivery requirements, rental term, and availability in your quote.

The proposed 96th Street Plaza remains on hold pending funding and an agreement with Surfside

The 96th Street Plaza remains a design rather than a construction site. The Village Council approved a Basis of Design Report in December 2019, then the design firm presented a vision in April 2020: a paved walk with a wave pattern, stepped seating, and wood canopies framing the ocean entrance.

The village says the project is on hold while funding and an agreement with Surfside remain unresolved. Its 2025–26 capital plan leaves the schedule undetermined. The concept therefore has a layout, but needs both a funding path and its neighbor’s agreement before it can move toward construction.

Supporting sources

Bal Harbour’s utility work replaces buried lines before streets are repaved

Bal Harbour is replacing underground water mains, repairing sewer and stormwater systems, shifting some service connections from the backs of homes to the fronts, then restoring streets after the buried work is done. The village moves through residential phases instead of opening the whole community at once. As crews shift from connections to paving on different blocks, a portable restroom trailer may need to move with the active phase while leaving driveways clear.

In its July 28, 2026 update, the village listed phases 1B, 2B, 3A, 3B, 4 and 5A as complete. Phase 6A was forecast for September, a date that has passed without a completion notice on the page; phase 6B was projected for November and phase 7 for early 2027. Later phases 5B/5C and a possible phase 8 had no settled schedule. The village says the wider project replaces aging underground infrastructure and is intended to improve water, sewer and stormwater service.

Supporting sources
Main restroom product prices

Portable restroom and shower/restroom trailer starting prices.

Compare starting prices for portable restroom and shower/restroom combination trailers in Bal Harbour. Confirm configuration, rental term, delivery, and availability with our team.

Starting prices for main restroom products in Bal Harbour, Florida
Main restroom productSize / configurationStarting price
Portable restroom trailerUnit-specific configuration$7,000
Shower/restroom combination trailer13 ft · 3 combination stalls$2,495
Shower/restroom combination trailer22 ft · 6 combination stalls$4,995
Shower/restroom combination trailer30 ft · 8 stalls$3,995

Supporting facility starting prices

Starting prices for supporting facilities in Bal Harbour, Florida
Supporting facilitySize / configurationStarting price
Shower container20 ft · 5 stalls$3,995
Laundry container20 ft$3,995
Laundry trailer26–27 ft · 8 washer/dryer units$3,995
Sleeper trailerConfiguration confirmed in quoteRequest quote

Prices shown are starting prices from the pricing sheet. It does not state a billing period for every item; confirm rental term, availability, delivery, setup, and equipment details in your quote.

Need help now? Call 888 385 6418 for 24/7 support and current availability.

Portable restroom trailer interior with a vanity and toilet

Plan restroom capacity for events in Sunny Isles Beach

For an event in Sunny Isles Beach, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Sleeper trailer exterior with a bunk-room inset

Maintain restroom access during facility work in North Bay Village

A renovation, repair, or temporary washroom closure in North Bay Village can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Portable shower-restroom combination trailer exterior

Plan restroom capacity for events in Hallandale Beach

For an event in Hallandale Beach, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Portable restroom trailer interior with a vanity and toilet

Set up crew restroom access for work in West Park

For construction, utility, or maintenance work in West Park, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Bal Harbour began a phased Collins and Harding Avenue realignment in 2025

Whiting-Turner began the Collins and Harding Avenue realignment in late June 2025, working in short sections between 96th Street and the 9800 block. The village’s July update described curb replacement and lane widening, utility relocation, a rebuilt bus apron, sidewalks, crosswalk adjustments, and signal work. Two southbound lanes were to remain open as each section closed.

A February 2026 village traffic alert said the next phase would move into the median and estimated about five months for that work. Two lanes in each direction were to remain open, with safety closures around the clock and regular work from 9 p.m. to 6 a.m. Those details show how the village planned to keep traffic moving while crews worked through the median.

Supporting sources

Bal Harbour opened its 1.5-acre Waterfront Park in January 2024

Bal Harbour opened its 1.5-acre Waterfront Park with a ribbon cutting on January 14, 2024. The grounds bring together an open lawn, strolling gardens, quiet meditation spaces, progressive exercise zones, and a “Mother Earth, Cycle of Life” playground designed by Danish firm Monstrum. A terraced garden, splash pad, and landscape canopy lead visitors toward the community center.

The building adds multipurpose event rooms, an indoor toddler playground, Recreation, Arts & Culture offices, and a landscaped roof deck for gatherings. The village says council approved the site-plan concept in 2018, several years before the park opened.

Supporting sources

Village Council rejected a proposed settlement over the Bal Harbour Shops development application

A special Village Council meeting on April 27, 2026, dealt with a legal dispute over Whitman Family Development’s application under Florida’s Live Local Act. The village had denied the Bal Harbour Shops application in November 2024, and council members now considered a mediator’s proposed settlement before voting unanimously to reject it.

The village’s notice the following day said the manager and village attorney were directed to continue defending the village in court. The vote rejected the proposed settlement; it did not approve construction or decide the development application. The case remained unresolved after the April meeting.

Supporting sources

Bal Harbour moves its new Village Hall and emergency center into schematic design

Bal Harbour’s June 2026 capital update moved the planned Village Hall, Police Station, and Emergency Operations Center into schematic design. The milestone followed approval of the building program and basis of design, which set out the departments and operational needs the complex must accommodate.

Schematic design turns that approved program into an initial layout for village review. Architectural Review Board review follows the next design-development stage, so the project is still being worked through on paper.

With security, public access, and staff needs still being worked through in design, the village has not announced a construction start for the complex.

Supporting sources
Separate shower trailer with an exterior handwashing area

Maintain restroom access during facility work in North Miami Beach

A renovation, repair, or temporary washroom closure in North Miami Beach can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Separate shower trailer with an exterior handwashing area

Maintain restroom access during facility work in Biscayne Park

A renovation, repair, or temporary washroom closure in Biscayne Park can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Preparation and delivery

Plan around the Bal Harbour address.

A project in Bal Harbour starts with the same practical questions: which functions need to remain available, how the trailer can reach its placement, and how utilities will connect.

  1. Describe the site and its users

    Share the location, expected occupancy, peak-use periods, and project dates.

  2. Review the restroom configuration

    Discuss portable restroom trailers or shower/restroom combination trailers as the main product, plus separate shower, laundry, or sleeper facilities if needed.

  3. Check site access and connections

    Confirm the delivery route, placement, accessible approach, water, wastewater, and service access.

  4. Confirm the rental plan

    Review equipment availability, rental terms, delivery, setup, and servicing arrangements.

  5. Coordinate use and return

    Agree on cleaning, restocking, service visits, and the return schedule before delivery.

Discuss your site ↗

Harbourfront Park and the Jetty project reached a final permit stage

Bal Harbour’s Harbourfront Park, jetty, and cutwalk are being planned as one waterfront project, pairing public space with a rebuilt seawall and a higher, more resilient walk. The design includes guardrails, turtle-friendly lighting, accessible routes, and construction phasing intended to preserve public and emergency access along the shore.

In its June 26, 2026 update, the village said the team was in the final stages of obtaining the last building permit. The next milestone was presentation of the construction manager’s guaranteed maximum price to council; the update did not announce a field start or schedule. Timing therefore still depends on permit clearance and the council’s review of the construction price.

Supporting sources

Bal Harbour completed seawall and dock reconstruction with a new boardwalk and kayak access

Near 18 Bal Bay Drive and 701 96th Street, a 2020 council memorandum laid out plans to replace the seawall and dock and add a boardwalk and kayak launch. It also recommended accepting a $705,097 Florida Inland Navigation District grant toward the marine work.

The village’s capital-program page now lists the replacement as complete. At the two waterfront locations, the project joined shoreline infrastructure with public access for people arriving by kayak.

Supporting sources

A construction worker dies after a confined-space rescue in Bal Harbour

Miami-Dade Fire Rescue was called to a construction site behind Bal Harbour Shops on August 28, 2025, near 98th Street and Collins Avenue. Firefighters brought a worker from a second-floor confined space and airlifted him to Ryder Trauma Center. CBS News Miami later reported that he died.

Early accounts raised the possibility of an explosion, but officials did not confirm one. A dispatcher later clarified there was no confirmed explosion, a distinction that mattered while the rescue was still unfolding and early descriptions were circulating.

Investigators had not issued a final finding in the coverage. The cause of the worker’s death and any workplace-safety conclusion remained unresolved.

Supporting sources

Bal Harbour placed about 191,750 cubic yards in its 2025 beach renourishment

The U.S. Army Corps of Engineers awarded Eastman Aggregate Enterprise a contract to place more than 200,000 cubic yards of upland sand along Bal Harbour’s critically eroded shoreline. The village’s 2026 coastal-management update records the result: sand placement ended September 8, crews finished demobilizing September 30, and the final volume was about 191,750 cubic yards. The contract target and the completed quantity differ, so the closeout figure is the more precise measure of what was placed.

The plan put the staging area at the 96th Street beach access and scheduled work from sunrise to sunset on weekdays, with Saturday work possible if needed. Off-road trucks used a signed route with UTV escorts and spotters, while fencing separated the operation from beachgoers.

Supporting sources
Sleeper trailer exterior with a bunk-room inset

Plan restroom capacity for events in Bay Harbor Islands

For an event in Bay Harbor Islands, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Portable restroom trailer interior with a vanity and toilet

Prepare a temporary restroom plan for a Surfside site

If a site in Surfside loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Sleeper trailer exterior with a bunk-room inset

Set up crew restroom access for work in Miami Shores

For construction, utility, or maintenance work in Miami Shores, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Sleeper trailer exterior with a bunk-room inset

Plan restroom capacity for events in Aventura

For an event in Aventura, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Rental planning questions

Bal Harbour portable restroom rental FAQs.

What is the starting price for a portable restroom trailer in Bal Harbour?

The starting price shown is $7,000. The pricing sheet does not state a billing period; confirm rental term, delivery, setup, and availability in your quote.

When can a portable restroom trailer be delivered to Bal Harbour?

Share your Bal Harbour address, desired start date, equipment size, and access conditions. The team confirms availability and a workable delivery schedule in the quote; this page does not publish a fixed arrival time.

What restroom configuration is available?

Portable restroom trailers and shower/restroom combination trailers are the main products. Separate shower trailers, laundry facilities, and sleeper units support related site needs.

What supporting facilities are available?

Standalone shower trailers, laundry facilities, and sleeper units can support the site. Portable restroom trailers and shower/restroom combination trailers are the primary bathroom products; configuration and availability are confirmed for the project.

What should I prepare for my Miami-Dade County site?

Bring the address, placement plan, delivery access details, expected users, accessible route needs, water and wastewater arrangements, servicing plan, dates, and site contact. Confirm applicable permits and inspections before dispatch.

WoodRentals Portable Restroom Trailer Rental

Plan restroom access in Bal Harbour.

Share your site, dates, and expected users. We’ll review portable restroom and shower/restroom combination trailer options, plus any shower, laundry, or sleeper facilities needed for your Florida project.