Portable shower-restroom trailer combination rentals in Archer, Florida.
Archer’s sewer and stormwater work can send crews from one area to another. With a shower-restroom trailer combination at the contractor’s staging point, the team has a reliable stop as the work moves along the route.
Explore Archer local projects and incidents ↓
- Portable restroom trailer starting price
- Starting at $7,000
- Delivery planning
- Delivery schedule confirmed in your quote
Explore restroom and related facility options for Archer.
Portable restroom trailers and shower/restroom combination trailers are the main products. Separate shower, laundry, and sleeper facilities can support other site needs in Alachua County.

Restroom Trailer
A portable restroom trailer rental can maintain bathroom access during restroom renovations, at active worksites, or at events with added demand. Review the restroom-only configuration around expected users, site access, and servicing needs.
View model details ↗
13ft Luxury Shower-Restroom Combination Trailer, 3 Stalls
Choose a portable shower/restroom combination trailer rental in a nominal 13ft layout with three individual stalls. This configuration gives a smaller temporary site one facility to consider for both daily washing and bathroom access.
View model details ↗
22ft Luxury Shower-Restroom Combination Trailer, 6 Stalls
A portable shower/restroom combination trailer rental in a nominal 22ft layout provides six individual stalls. Compare this model when a temporary accommodation area, worksite, or facility renovation needs more simultaneous access than a three-stall configuration.
View model details ↗
20ft Shower Trailer, 5 Stalls with Handwashing Sink
A portable shower trailer rental with five stalls and a handwashing sink can support workforce accommodation, building repairs, or extended field operations. Plan shower schedules, water supply, and wastewater service for the nominal 20ft unit.
View model details ↗
26–27ft Laundry Trailer
A mobile laundry trailer rental in the nominal 26–27ft range can support washing and drying during workforce accommodation or extended site projects. Compare the assigned machine schedule with expected loads, operating hours, and shared-use routines.
View model details ↗
2-Stall Sleeper Trailer
Plan separate sleeping areas for a small crew or assigned staff. The 2-stall sleeper option can form part of a temporary camp without committing to a large shared sleeping hall.
View model details ↗Main restroom products and supporting facilities.
Portable restroom trailers and shower/restroom combination trailers are the main products. Shower, laundry, and sleeper facilities support related site needs in Archer.
Scroll across the table to compare configurations.
| Product or facility | Size / configuration | Role | Facility type |
|---|---|---|---|
| Portable restroom trailer | Unit-specific configuration | Main product | Portable restroom |
| Shower/restroom combination trailer | 13 ft · 3 combination stalls | Main product | Shower + restroom |
| Shower/restroom combination trailer | 22 ft · 6 combination stalls | Main product | Shower + restroom |
| Shower/restroom combination trailer | 30 ft · 8 stalls | Main product | Shower + restroom |
| Shower container | 20 ft · 5 stalls | Supporting facility | Shower |
| Laundry container | 20 ft | Supporting facility | Laundry |
| Laundry trailer | 26–27 ft · 8 washer/dryer units | Supporting facility | Laundry |
| Sleeper trailer | Configuration confirmed in quote | Supporting facility | Sleeper accommodation |
Confirm the assigned unit’s layout, delivery requirements, rental term, and availability in your quote.
Archer completed the first phase of its septic-to-sewer project
Eight miles of main transfer pipe between Archer and Newberry marked completion of the first phase of Archer’s three-part septic-to-sewer project in October 2026. City leaders said the $6.5 million phase finished within its 103-day contract period and budget, while roughly two more years of work remained across the full project.
The next phase involves crossings on roads controlled by FDOT. The final phase will build the collection system inside Archer while Newberry constructs the treatment plant. Residents who connect during the initial window are not expected to pay hookup costs.
Supporting sources
A July boil-water advisory near Doe Run was later lifted
Archer posted a precautionary boil-water notice on July 16, 2026, for customers north of the State Road 45 traffic light and residents of the Doe Run subdivision. The city’s notice named those two areas rather than the entire Archer water system.
Four days later, on July 20, Archer posted that the notice had been rescinded for the same customers. The public notices document the affected area and the all-clear date, but do not describe what triggered the precaution or how many households were covered; they also do not report a confirmed contamination result.
Portable restroom and shower/restroom trailer starting prices.
Compare starting prices for portable restroom and shower/restroom combination trailers in Archer. Confirm configuration, rental term, delivery, and availability with our team.
| Main restroom product | Size / configuration | Starting price |
|---|---|---|
| Portable restroom trailer | Unit-specific configuration | $7,000 |
| Shower/restroom combination trailer | 13 ft · 3 combination stalls | $2,495 |
| Shower/restroom combination trailer | 22 ft · 6 combination stalls | $4,995 |
| Shower/restroom combination trailer | 30 ft · 8 stalls | $3,995 |
Supporting facility starting prices
| Supporting facility | Size / configuration | Starting price |
|---|---|---|
| Shower container | 20 ft · 5 stalls | $3,995 |
| Laundry container | 20 ft | $3,995 |
| Laundry trailer | 26–27 ft · 8 washer/dryer units | $3,995 |
| Sleeper trailer | Configuration confirmed in quote | Request quote |
Prices shown are starting prices from the pricing sheet. It does not state a billing period for every item; confirm rental term, availability, delivery, setup, and equipment details in your quote.
Need help now? Call 888 385 6418 for 24/7 support and current availability.
Archer’s January report recorded water-leak repairs at three locations
Three water-leak repairs appeared in Archer’s January 2025 city-manager report: one at 16554 SW 132nd Avenue, another at 14402 State Road 45 and a third on SW 141st Road. The report described them as the previous month’s work and attributed the SW 141st Road leak to the county.
Public-works staff also recorded meter readings and water shutoffs in the same monthly account. The report listed three separate repairs rather than one systemwide outage, and did not describe a longer service interruption.
Supporting sources
Archer lifted a boil-water advisory in Thistle Hills West
Archer’s August 6, 2026 precautionary boil-water notice named SW 143rd Avenue, SW 168th Street, SW 167th Street and SW 141st Place in Thistle Hills West. The city later posted a rescission for those same streets on August 13.
A separate notice less than a month earlier covered Doe Run and customers north of SR 45; Archer lifted that one on July 20. The seven-day span is the timeline shown by the city’s Thistle Hills notices. They identify the affected neighborhood and when the precaution ended, but do not give a cause or report how many service connections were covered. The city’s public record does not say that contamination was confirmed.

Plan restroom capacity for events in Newberry
For an event in Newberry, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Maintain restroom access during facility work in Bronson
A renovation, repair, or temporary washroom closure in Bronson can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Maintain restroom access during facility work in Otter Creek
A renovation, repair, or temporary washroom closure in Otter Creek can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Prepare a temporary restroom plan for a La Crosse site
If a site in La Crosse loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Set up crew restroom access for work in Worthington Springs
For construction, utility, or maintenance work in Worthington Springs, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Maintain restroom access during facility work in Fort White
A renovation, repair, or temporary washroom closure in Fort White can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.
Archer’s wastewater connection to Newberry reached the construction stage
Archer’s wastewater connection to Newberry had moved beyond drawings by August 2026. A phase-one schedule dated August 22 recorded construction starting August 10 and horizontal directional drilling finishing August 17. The schedule also listed a June 22 notice to proceed and permitting involving Newberry, Alachua County, FDOT and the Florida Department of Environmental Protection. Work areas included US 41/27, SW 170th Street at Limerock Road and SW 30th Avenue in Newberry.
Each crossing is a separate work zone, so if the crew uses a portable restroom trailer, it would need to move with the work base without closing highway or neighborhood access. The August schedule targeted September 28 for pressure testing and September 29 for closeout; those dates were targets, not proof of completion.
Residents continued to question permits for Archer’s proposed concrete plant
The proposed Arnold Ready Mix concrete batch plant at Archer’s former foundry site remained a point of contention in August 2025. County staff told commissioners that the project had authorizations from the city, FDOT, the Suwannee River Water Management District and the county’s stormwater program. Some residents said the approvals had been difficult to track and that concerns about noise, traffic and pollution remained.
The proposal had drawn a split vote at the Planning and Zoning Board and went through a revised application after an earlier version was withdrawn. The August account described permit approvals and community objections, not construction underway.

Prepare a temporary restroom plan for a Williston site
If a site in Williston loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Prepare a temporary restroom plan for a Gainesville site
If a site in Gainesville loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Plan restroom capacity for events in Micanopy
For an event in Micanopy, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Set up crew restroom access for work in Reddick
For construction, utility, or maintenance work in Reddick, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Plan restroom capacity for events in Fanning Springs
For an event in Fanning Springs, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.
Plan around the Archer address.
A project in Archer starts with the same practical questions: which functions need to remain available, how the trailer can reach its placement, and how utilities will connect.
- Describe the site and its users
Share the location, expected occupancy, peak-use periods, and project dates.
- Review the restroom configuration
Discuss portable restroom trailers or shower/restroom combination trailers as the main product, plus separate shower, laundry, or sleeper facilities if needed.
- Check site access and connections
Confirm the delivery route, placement, accessible approach, water, wastewater, and service access.
- Confirm the rental plan
Review equipment availability, rental terms, delivery, setup, and servicing arrangements.
- Coordinate use and return
Agree on cleaning, restocking, service visits, and the return schedule before delivery.
Archer got more time to complete its Holly Hills stormwater grant paperwork
The Holly Hills stormwater pond project was still moving through grant paperwork when Archer’s interim city manager filed her January 2025 report. The Suwannee River Water Management District extended the deadline to sign the agreement to February 6, giving the city more time to work through its finances and other grants.
An attached email confirmed the extension and raised the possibility of receiving grant money in advance. The immediate milestone was securing the paperwork needed to move the drainage project forward; the report did not say construction had begun or give a field schedule.
Supporting sources
County commissioners approved only part of Archer’s wastewater loan request
Archer’s wastewater plan hit a financing obstacle in May 2025 when the city asked Alachua County for $253,000 to pay engineering invoices. City leaders warned that the project could lose a $13 million state grant if the firm was not paid and its design documents remained unavailable. The county approved $68,732—about a quarter of the request—and suggested Archer seek the remaining amount from Newberry, its regional partner.
The discussion reflected a larger $30 million wastewater undertaking, including a treatment-facility partnership and a collection system in Archer. The requested loan was meant to bridge a short-term cash gap while design work continued.

Winn-Dixie opens a renovated Alachua grocery store
Winn-Dixie opened its Alachua store on October 3, 2026, following a full renovation of the space at 15560 NW US Highway 441. The project included a new exterior facade and updated interiors.

Prepare a temporary restroom plan for a High Springs site
If a site in High Springs loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.

Set up crew restroom access for work in Trenton
For construction, utility, or maintenance work in Trenton, estimate restroom use by crew size and shift. Place a trailer where workers can reach it safely without blocking equipment, deliveries, or emergency access.

Maintain restroom access during facility work in Bell
A renovation, repair, or temporary washroom closure in Bell can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Plan restroom capacity for events in Hawthorne
For an event in Hawthorne, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.
Archer received a $13 million state grant for wastewater improvements
Florida announced a $13 million grant for Archer’s wastewater improvements in March 2025. WUFT reported that it was the city’s largest state award in recent years. The funding was intended to help Archer join Newberry’s regional wastewater treatment project and address long-running problems at Archer’s existing plant.
The two cities had entered an interlocal agreement in January 2024: Newberry would provide the regional treatment facility, while Archer would build the lines carrying wastewater to it. WUFT reported that the plant had struggled for more than 30 years and had already received $6.8 million in state help.
Supporting sources
Archer and Alachua County finished resurfacing SW 143rd Avenue
Southwest 143rd Avenue was resurfaced in December 2024 after the City of Archer asked Alachua County for help earlier that year. The county was already working with a contractor on nearby Southwest 170th Street, so it also took on inspection and project-management duties for the Archer street. Archer’s interim city manager said the arrangement saved taxpayer dollars and brought an early finish.
The road is inside the City of Archer, and the work was funded through the voter-approved Wild Spaces Public Places/Infrastructure surtax. Archer reimbursed the county for its share from the city’s allocation.
Supporting sources

Maintain restroom access during facility work in McIntosh
A renovation, repair, or temporary washroom closure in McIntosh can change how staff, visitors, and contractors reach restroom facilities. A portable restroom trailer can provide a temporary option near the areas affected by the work.

Plan restroom capacity for events in Chiefland
For an event in Chiefland, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Plan restroom capacity for events in Brooker
For an event in Brooker, portable restroom trailers can add temporary bathroom capacity when venue facilities do not cover the planned attendance or site layout. Review guest numbers, peak periods, hours, and accessible routes while the event plan is taking shape.

Prepare a temporary restroom plan for a Waldo site
If a site in Waldo loses access to permanent restrooms or needs temporary capacity, identify the responsible site contact, users, operating hours, and a safe place for a trailer. Coordinate the plan with the organization managing the site.
Archer portable restroom rental FAQs.
What is the starting price for a portable restroom trailer in Archer?
The starting price shown is $7,000. The pricing sheet does not state a billing period; confirm rental term, delivery, setup, and availability in your quote.
When can a portable restroom trailer be delivered to Archer?
Share your Archer address, desired start date, equipment size, and access conditions. The team confirms availability and a workable delivery schedule in the quote; this page does not publish a fixed arrival time.
What restroom configuration is available?
Portable restroom trailers and shower/restroom combination trailers are the main products. Separate shower trailers, laundry facilities, and sleeper units support related site needs.
What supporting facilities are available?
Standalone shower trailers, laundry facilities, and sleeper units can support the site. Portable restroom trailers and shower/restroom combination trailers are the primary bathroom products; configuration and availability are confirmed for the project.
What should I prepare for my Alachua County site?
Bring the address, placement plan, delivery access details, expected users, accessible route needs, water and wastewater arrangements, servicing plan, dates, and site contact. Confirm applicable permits and inspections before dispatch.
Plan restroom access in Archer.
Share your site, dates, and expected users. We’ll review portable restroom and shower/restroom combination trailer options, plus any shower, laundry, or sleeper facilities needed for your Florida project.